logo
Rumah > Produk > Mesin Pembentuk Roll Highway Guardrail >
Crash Barrier Highway Guardrail Roll Forming Machine Two Waves

Crash Barrier Highway Guardrail Roll Forming Machine Two Waves

4kw crash barrier roll forming machine

2waves crash barrier roll forming machine

two waves guardrail roll forming machine

Tempat asal:

China daratan

Nama merek:

FMS

Sertifikasi:

ISO CE

Hubungi Kami
Minta Penawaran Harga
Detail Produk
Nama Produk:
Mesin Roll Forming Pagar Pembatas Jalan Raya Crash Barrier Dua Gelombang
Bahan roller:
45# baja
Motor:
4KW
Bahan roller:
Perawatan pendinginan GCr15,Cr12,SKD11: HRC58-62(opsional)
Voltase:
380V.50HZ.3Phase
Spesifikasi:
8*1.5*1.3m
Kecepatan:
0-15m/mnt
Jenis pemotongan:
Pemotongan hidrolik
Menyoroti:

4kw crash barrier roll forming machine

,

2waves crash barrier roll forming machine

,

two waves guardrail roll forming machine

Syarat Pembayaran & Pengiriman
Kuantitas min Order
1 Set
Harga
negotiable
Kemasan rincian
FLC 40'
Waktu pengiriman
50 hari kerja
Syarat-syarat pembayaran
L/c, t/t, d/a, d/p
Menyediakan kemampuan
20 set per bulan
Deskripsi produk

Crash Barrier Highway Guardrail Roll Forming Machine Two Waves

 

   In order to keep the product shape and precision, adopts welded sheet structure,motor reducer drive, chain transmission,roller was chromed which can keep the molding plate surface smooth and not easy to be marked when it is working Ensure stability , precision and lifetime.

 

Specification

ain Forming machine Forming steps 18 steps
Shaft diameter 80mm
Machine stand Individual Arch Plate
Machine frame steel plate welded
roller material Cr15
shaft material 45# steel with quenching and tempering
Work speed 0-15m/min
Transport By chains
Power of main machine 22kw
Voltage 380V-50HZ-3P(as required)
Machine dimension 14*1.5*1.2m
Machine weight About 8.5T
Machine color Yellow and blue(as required)

 

 

 

Guarantee

 

  1. Guaranteed against malfunctions due to manufacturing defects for1 years after date of purchase except Electrical parts.

  2. Repairs will not be performed even during the guarantee period in the follow circumstances

- Damage occurs due to a natural disaster

- Malfunction occurs due to user error

- Malfunction occurs due to modifications

- Malfunction occurs due to further movement or shipment after installation

 

Payment terms

 

  40% in advance as down payment

  60% is paid before the shipment is processed

 

Delivery

 

  FOB: Tianjin Xingang Port

  The Delivery Time: 60 working days after the down payment is received.

 

Crash Barrier Highway Guardrail Roll Forming Machine Two Waves 0

 

 

 

Kirimkan pertanyaan Anda langsung kepada kami

Kebijakan Privasi Cina Kualitas Baik Mesin Roll Forming Atap Pemasok. Hak cipta © 2020-2025 Cangzhou Famous International Trading Co., Ltd Semua hak dilindungi.